What document outlines responsibilities regarding defects post-project completion?

  1. Changes proposal

  2. Warranty document

  3. Completion agreement

  4. Indemnification document

The correct answer is: Warranty document

The warranty document is crucial in defining the responsibilities related to defects that may arise after the project's completion. This document typically lays out the terms and conditions under which a contractor agrees to repair, replace, or correct any materials or workmanship that are found to be defective during a specified warranty period. A warranty provides legal protection for the client by ensuring that the contractor is accountable for any issues that could compromise the integrity or functionality of the construction once the work is finished. It clarifies the duration of the warranty period, the scope of what is covered, and any obligations that the client must fulfill to maintain the warranty (such as regular maintenance). In contrast, the other options do not specifically address post-project defects. A changes proposal pertains to modifications made during the project, a completion agreement indicates the acceptance of the completed work, and an indemnification document outlines liability coverage but does not directly deal with defects in workmanship or materials. Thus, the warranty document is the essential reference for post-completion responsibilities regarding defects.